Rules for maintaining cleanliness When working on the fuel/injection system, the following industrial hygiene rules must be carefully observed. Before disconnecting parts, thoroughly clean the...
Plan for connecting the boost pressure control system Plan for connecting the boost pressure control system: 1. Vacuum receiver 2. Throttle valve -N211- 3. Exhaust gas recirculation valve -N18- 4. Check valve....
Turbocharger — design description Turbocharger: 1. Exhaust manifold 2. 25 Nm, replace, grease the threads and bearing surfaces of the head with heat-resistant paste 3. Intake manifold 4. From...
Removal and installation of a turbocharger Withdrawal Remove the engine hood. Remove engine cover. Remove the noise shield located below, to do this, disconnect the crankcase breather hose. Use a...
Removal and installation of the intercooler Withdrawal Instruction. Before checking or repairing, check all hoses and lines for accuracy and tightness. Remove soundproof screen. Remove bumper cover....
Exhaust System — Design Description Exhaust system: I. 23 Nm, replace 2. Gasket, replace 3. Turbocharger 4. Mounting loop, replace if damaged 5. Clamp, for replacing the pre-catalyst and main...
Exhaust Gas Recirculation System — Design Description Exhaust gas recirculation system: 1. Intake manifold 2. O-ring, replace 3. Air intake pipe with mechanical exhaust gas circulation valve and intake manifold...